View Issue Details

IDProjectCategoryView StatusLast Update
0000463T99X171.00 SKB EagleHWpublic2021-12-23 17:22
Reporter(ALTech) SY Yoon Assigned To(PM) Sheila Tu Due Date
PrioritynormalSeveritys2-severeReproducibilityhave not tried
Status closedResolutionopen 
Summary0000463: Weld line on Rear side
DescriptionWeld line on Rear side
TagsNo tags attached.
Attach Tags

Users monitoring this issue

User List (ALTech) BY Lee , (ALTech) Juyoung Park , (ALTech) Philip , (ALTech) SH Son , (ALTech) SY Yoon , (HW) Sean Chiang

Activities

(PM) Sheila Tu

2019-02-27 13:20

developer   ~0001234

Need to discuss with SKB on T1 sample

(PM) Sheila Tu

2019-03-12 20:37

developer   ~0001473

Last edited: 2019-03-12 20:39

We're discussing Eagle's tooling design with tooling vendor. There are two ways to proceed with the slide surfaces.
1. Mold by 4 pcs sliding block =>There will be a weld line on each corner.
    (It's not obvious on Amazon fire TV because the four corners are designed by the nearly right angle. However, you can feel the mold line when you touch the corner)
2. Mold by 1pcs sliding block + cold-cavity mold => There will be 2 mold lines on the rear side, and the angle of lines will be 3 degrees.

Because we need the sliding block to I/O holes, the mold lines are not avoided.
I attached a photo for your reference about the mold line with 3 degrees, and I think it'll be more obvious on Eagle because the current texture of each side surface is polishing.
I suggest that we discuss this issue with SKB and see whether they insist to use the polishing texture on the rear side before hard tooling.

1pcs sliding mold.jpg (41,773 bytes)   
1pcs sliding mold.jpg (41,773 bytes)   
4pcs sliding mold.jpg (132,869 bytes)   
4pcs sliding mold.jpg (132,869 bytes)   

(PM) Sheila Tu

2019-03-13 14:23

developer   ~0001496

After a full discussion with the tooling vendor, our mechanical engineer provided three proposals for your reference.
Because it impacts to tooling schedule, tooling sample schedule, and cost, could we have a decision within 3/13?

(ALTech) SY Yoon

2019-03-14 20:21

developer   ~0001528

We discussed with SKB engineer.
She confused about weld line.
She knew weld line as a wave-shaped spot. And she think parting line that 2 toolings make a line.
She knew we cannot remove parting line.
So we will get some samples of their product before tomorrow.
If I can get this sample, then I will send it to you through Mr. Vincent Tong.
And they worried about the angle between bottom and side face.
So we keep our original design. Its angle is 91.5 degree. And please keep Eagle parting line(Weld line) as smaller as we can.
Please check the Parting line(Weld line) of sample that I will send tomorrow.
And let me know you can manage it or not.

Issue History

Date Modified Username Field Change
2019-02-22 11:32 (SW) Jacky Chiang New Issue
2019-02-27 13:19 (PM) Sheila Tu Assigned To => (PM) Sheila Tu
2019-02-27 13:19 (PM) Sheila Tu Status new => assigned
2019-02-27 13:20 (PM) Sheila Tu Status assigned => feedback
2019-02-27 13:20 (PM) Sheila Tu Note Added: 0001234
2019-03-12 19:45 (PM) Sheila Tu Issue Monitored: (ALTech) SY Yoon
2019-03-12 19:48 (PM) Sheila Tu Issue Monitored: (ALTech) Philip
2019-03-12 19:48 (PM) Sheila Tu Issue Monitored: (HW) Sean Chiang
2019-03-12 20:37 (PM) Sheila Tu Reporter (SW) Jacky Chiang => (ALTech) SY Yoon
2019-03-12 20:37 (PM) Sheila Tu Category PM => HW
2019-03-12 20:37 (PM) Sheila Tu File Added: 1pcs sliding mold.jpg
2019-03-12 20:37 (PM) Sheila Tu File Added: 4pcs sliding mold.jpg
2019-03-12 20:37 (PM) Sheila Tu File Added: weld line with matt texture.jpg
2019-03-12 20:37 (PM) Sheila Tu Note Added: 0001473
2019-03-12 20:39 (PM) Sheila Tu Note Edited: 0001473
2019-03-13 14:23 (PM) Sheila Tu File Added: Eagle 4K OTT BOX top cover tooling proposal.pdf
2019-03-13 14:23 (PM) Sheila Tu Note Added: 0001496
2019-03-14 20:21 (ALTech) SY Yoon Note Added: 0001528
2019-03-14 20:21 (ALTech) SY Yoon Status feedback => assigned
2019-04-29 16:40 (ALTech) SB Park Issue Monitored: (ALTech) BY Lee
2019-04-29 16:40 (ALTech) SB Park Issue Monitored: (ALTech) Juyoung Park
2019-05-30 11:11 (ALTech) SB Park Issue Monitored: (ALTech) SH Son
2021-12-23 17:22 (SW) Jacky Chiang Status assigned => closed